Floor is Done!
The new hardwood floor in the office (4th bedroom) is done! Now I’m just waiting for the baseboards; those will need to be polyurethaned and installed in both the office and the living room / dining room. That will be a bit of a project in and of itself as I have 144 feet of baseboard coming!
It will be wonderful to have the project done, but I do fear that I’ll have to add an additional piece of trim to some of the baseboards in the downstairs – I left too much of a gap between the flooring and the wall in some spots.